Electrical Commissioning, Isolations and Permit – Road Infrastructure
PROJECT OVERVIEW
The North Link 3 project is a 22 kilometre section of dual carriageway which runs from Maralla Road in the South to Muchea in the North.
SCOPE OF WORK
The RSGx scope included the electrical project engineering for the construction and electrical commissioning personnel along with an isolations and permits function for both construction and commissioning.
The NorthLink project team’s constructive approach helped the RSGx team to manage the execution of the commissioning of the project in a safe and time efficient manner
Read more about the project in the project case study, which can be downloaded through the below link.